City Grid reconstruction project of Huhehaote, Inner Mongolia Electricity Board
Huhehaote, Inner Mongolia Electricity Supply Co., Ltd
circuit route planning and put underground
primary drawings, working drawings and completing drawing designing
2013
The project was finished in December 2013. 15-kilometer City Grid is designed. mainly involving 35kV and 10kV circuits and partial 110kV circuits, as an important project of city grid upgrade and reconstruction of Huhehaote Electricity Board
]]>Secondary pressure-reducing reconstructing project of Ji Steel
Shan Steel Group
110kV AIS transformer station converted to GIS one
working drawings and completing drawings
2011
The project has been put into use since November 2011. The outdoor AIS transformer station of ji Steel was converted to an indoor GIS transformer station with 300-meter cable tunnel at the same time, as a pivotal project of secondary pressure-reducing upgrade and reconstruction and cables buried underground.
]]>220kV pressure-increasing project of Dongming Plastic
New Hope Group
220kV pressure-increasing station and distributing circuits
primary drawings, working drawings and completing drawing designing
2014
40-kilometer 220kVcircuits are designed and one transformer station of 220/22kv as a transmission project of Chemical3 and 4 sets of Dongming, Xinjiang Plastic.
]]>Electricity transfer and transformation of Chiping Xinfa
Xinfa Group
220kV circuits and pressure-reducing station
working drawings and completing drawing designing
2014
The project has been put into use since October 2013. 5-kilometer 220kV circuits are designed and one transformer station of 220/110/10kv as a key project of electricity utilization of Huaxing Chemical Industrial Zone of Huafa Group.
]]>