熱力工程
Provides heating boiler, heat exchange station and heat-supply network design and installation for centralized heating
Project
Central heat supply project of Linfen Haizi Dongcheng
Constructing company
Linfen Haizi Gas and Heat Supply Co., Ltd
Constructing scale
(1) Building a new heat pipe trench at a length of 20km with the pipe diameter of DN200-DN900
(2)Building 30 new water-water heating stations(including branching valve wells to thermo network pipes among heating stations)
Working range
primary designing and working drawings
Period of project
2014