新能源工程

Includes; wind power, biomass, solar power generation and cogeneration recycling.

Project

Combined heat and power generator in Lianghe District of Shandong Mingke Energy Saving Engineering Co., Ltd

Constructing company

Shandong Mingke Energy Saving Engineering Co., Ltd

Equipping plan

2 biomass CBF boilers with high temp and high pressure+2 15MW turbo generator sets sets supplying heat by extracting and condensing with a total capability of 30MW

Working range

primary designing, working drawings and completing drawing designing.

Period of project

2014